发布时间:2021-06-10
Time | University | Specialty | Degree |
1993-1996 | Tianjin University | Management Science and Engineering | Master |
1979-1983 | Tianjin University of Technology | Electronic Instrument | Bachelor |
Time | Company | Position |
1996-now | College of Management and Economics, Tianjin University | Teacher |
1986-1996 | School of management, Tianjin University | Teaching management |
1983-1986 | Tianjin Electronic Instrument Factory | Quality Engineer |
[1] Introduction and Simulation Design of Kanban System. Journal of Tianjin University(Social Sciences). 2011, 2;
[2] Profit Distribution Model for Vendors and Distributors Based on Vendor Managed Inventory Strategies, Industry Engineering Journal, 2008. 9;
[3] Optimization of Continuous Facility Layout by Genetic Algorithm, Industry Engineering Journal, 2007.11
[4] Application of Improved Fishbone Diagram in the Operation Management. Industry Engineering Journal. 2007. 2;
[5] Research on the Evaluation Methods of SMEs Technological Innovation Fund Projects, Science of Science and Management of Science and Technology, 2007.2;
[6] Statistical Distribution of Service Duration in a Telecommunication Call Center, Industry Engineering Journal, 2006.4,
[7] Development of Higher Education in Industrial Engineering, Industry Engineering Journal, 2005. 7;
[8] Industrial Engineering (Part 3) A Research on Optimal Design of Plane Layout for the Logistic System in Manufacturing Industry, Construction Machinery and Equipment, 2005. 11;
[9] The Tendency of Application in Industrial Engineering, Research in Higher Education of Engineering, 2005. 4;
[1] Logistics Enterprise Management, Tsinghai University Press, 2010. 3;
[2] Fundamentals of Management, Tianjin University, 2001. 7;
[3] International Project Marketing. China Architecture & Building Press, 1996. 6.
[1] Research on Reconstruction and Control Technology of Dynamic System of Complex Chaotic Economic Time Series, The National Natural Science Fund, 2003-2005;
[2] Research on Reform and Development of Management Science and Engineering, The State Education Commission, 2002-2005;
[3] The Level of Enterprise Capability—dimension System and the Level of Mechanism of Evolution, The National Natural Science Fund, 2002-2004.
[1] Benchmarking of Research Management on Natural Gas and Pipeline Business, Development Projects, 2011-2012;
[2] The Study of the Mode of Three Section Charging of Beijing-Shijiazhuang High-speed, Development projects, 2009-2010;
[3] Management Improvement of Logistics Center of ZaoZhuang Mining Group, Development Projects, 2009-2010;
[4] Management Improvement of China Post Logistics in Tianjin, Development Projects, 2009;
[5] Construction of Appraisal System of Project of Tianjin Electric Power Design Institute, Development Projects, 2008-2009;
[6] The Feasibility Study of Marketing Development of LNG, Development Projects, 2005.