发布时间:2021-06-10
Time | Institution | Degree Position |
---|---|---|
2001-2004 | Management Science and Engineering, Tianjin University | Ph.D |
1998 – Present | College of Management and Economics, Tianjin University | Director of Construction Management Department, |
2001– Present | College of Management and Economics, Tianjin University | Professor |
1996 | The Hong Kong University of Science and Technology | Visiting Scholar |
1995 | College of Economic Development of Washington World Bank (US) | Visiting Scholar |
[1] Wang, X. (2011). Construction Project Management. High Education Press, Beijing, China
[2] Wang, X. (2011). Construction Project Cost Plan and Control. China Construction Industry Press, Beijing, China
[3] Wang, X. (2011). Construction Cost Evaluation (2nd Edition). China Construction Industry Press, Beijing, China
[4] Wang, X. (2011). Construction Project Economics (3rd Edition). China Construction Industry Press, Beijing, China
[5] Wang, X. and et al. (2011). Construction Project Organization and Management. China Planning Press, Beijing, China
[6] Wang, X. (2010). Investment Control of Construction Projects. China Intellectual Property Press, Beijing, China
[7] Wang, X. (2006). Construction Cost Evaluation. China Construction Industry Press, Beijing, China
[8] Wang, X. (2000). International Project Management. China Construction Industry Press, Beijing, China
[9] Qi, E., and Wang, X. (2002). Management Science and Engineering Education Reform and Development Strategy. High Education Press, Beijing, China
[10]Wang, X. (2009). Construction Project Economics (2nd Edition). China Construction Industry Press, Beijing, China
[11]Wang, X. and et al. (2009). Construction Project Management (2nd Edition). China Construction Industry Press, Beijing, China
[12]Wang, X. and et al. (2008). Construction Project Organization and Management. China Planning Press, Beijing, China
Technical Patents
[1]A study on DEA with SEM constrained cone: model design and empirical usage [J].Journal of Beijing Institute of Technology,2011(5).
[2] A PCA and DEA-DA based systematic evaluation on China regional construction industry competence [J].China Journal of Civil Engineering,2011(2).
[3] An analysis on the formation mechanism of China regional construction industry competence : based on PLS structural equation modeling [J].Application of Statistics and Management,2011(1).
[4]A SEM and SD based simulation on the dynamic formation of China construction industry competence [J].System Engineering: Theory and Practice,2010(11).
[5]Comparison and Enlightenment of Construction Management Undergraduate Education among China, US and UK[J].China University Teaching,2010(6).
[6] Evaluation of Construction Market Participator of Practicing Qualification Based on Matter-Analysis Theory [J].Soft Science,2009(7).
[7]Land-use evaluation using improved C-IOWA operator [J].Journal of Beijing Institute of Technology,2009(4).
[8]A study on construction supervision and its liability insurance [J].China Journal of Civil Engineering,2009(1).
[9]RS and ANFIS based bidding decision support [J].Journal of Hunan University,2008(5).
[10] A Dynamic Grey-Fuzzy Evaluation Method for Financing Risk in Freeway Project [J].Journal of Chongqing Jianzhu University,2008(5).
[11] Study of construction project bidding based on the BP neural network improved by GA [J].China Journal of Civil Engineering,2007(7).
[12] Project Evaluation based on Oriental Holism: the Combination of Science and Arts [J].China Journal of Management,2007(4).
[13] Study on demarcating lines for professional qualification examination [J].Journal of Southeast University,2007(3).
[14] Game Analysis for Trust Mechanism under Partnering Mode in Engineering Management [J].Journal of Tianjin University,2007(1).
[15] Construction Management in Post-disasters Restoration and Reconstruction on the perspective of Public participation: Participatory Reconstruction. the 14th Symposium on Construction Engineering and Management, National Taiwan University, 2010
[16] Study on credit classification of practicing qualification personnel in construction market based on BP neural network. 2009 International Conference on Information Management, Innovation Management and Industrial Engineering, ICIII 2009
[17] Some New Aggregation Operators and Their Application in Group Decision-making Based on Fuzzy Preference Relations. Proceedings of The 5th IEEE International Symposium on Embedded Computing, SEC, 2008
[18] Study of construction bidding system based on combination of rough set theory and back-propagation network, 2007
[1] The decision model of the intuitionistic fuzzy group bid evaluation for urban infrastructure projects considering social costs[J].Canadian Journal of Civil Engineering,2013(3).
[2] Differentiation about the formation mechanism of Chinese construction industry competitiveness under the spatial dimension [J].Systems Engineering-Theory &Practice,2013(5).
[3] A credit evaluation method based on modified cloud model [J].Systems Engineering,2013(4).
[4] A modified generalized extreme value distribution methodology to predict the maximum corrosion depth of nuclear pipes [J].Journal of Central South University (Science and Technology),2013(5).
[5] Fuzzy comprehensive evaluation based on cross-evaluation and its application [J]. Control and Decision, 2012(4).
[6] A contractor prequalification method based on interval numbers and grey related analysis [J]. Fuzzy Systems and Mathematics, 2012(6).
[7] A contractor prequalification model based on fuzzy sets theory [J]. Fuzzy Systems and Mathematics, 2012(3).
[8] Inter-provincial difference in energy efficiency of construction industry and its influencing factors in China [J]. China Population, Resources and Environment, 2012(2).
[9] A combined model-based systematic evaluation research about China's Regional construction industry competitiveness [J]. Tongji Daxue Xuebao/Journal of Tongji University, 40(5), 2012.
[10] A fuzzy risk assessment method for bidding of construction projects based on credibility theory [J]. Fuzzy Systems and Mathematics, 2011(5).
[11] A PCA and DEA-DA based systematic evaluation on China regional construction industry competence [J].China Journal of Civil Engineering,2011(2).
[12] Analysis of Chinese Construction Industry Competitiveness Formation Mechanism- Empirical Research of PLS-Based Structural Equation Model [J].Journal of Applied Statistics and Management,2011(1).
[13] Professional Degree Education of Master of Engineering Management in Foreign Countries and Experiences to be learned by China. Science & Technology Progress and Policy,2011(13)
[14] A SEM and SD based simulation on the dynamic formation of China construction industry competence [J].System Engineering—Theory and Practice,2010(11).
[15] Research on Land Biding Evaluation Method Based on Improved C-IOWA Operator[J].Transactions of Beijing Institute of Technology,2009(4).
[16] A Study on Construction Supervision and its Liability Insurance [J].China Journal of Civil Engineering,2009(1).
[17]Study of Construction Project Bidding Based on the BP Neural Network Improved by GA [J].China Journal of Civil Engineering,2007(7).
[18]Evaluating Projects under the Direction of W-S-R Methodology [J].China Journal of Management,2007(4).
[19]A Contractor Prequalification Model based on Triangular Fuzzy Number and TOPSIS. 2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, 2011. (EI: 20114514486328)
[20]The Priority of Fuzzy Complementary Judgment Matrix and Its Application in Procurement Tenders for Government Project. 2010 IEEE 17th International Conference on Industrial Engineering and Engineering Management, 2010. (EI: 20105213534823)
[21]Study on credit classification of practicing qualification personnel in construction market based on BP neural network. 2009 International Conference on Information Management, Innovation Management and Industrial Engineering, 2009. (EI: 20101012757534)
[22]Some New Aggregation Operators and Their Application in Group Decision-making Based on Fuzzy Preference Relations. Proceedings of The 5th IEEE International Symposium on Embedded Computing, 2008. (EI: 20090211848228)
[23]Study on Engineering Project Manager Selection. 2008 International Conference on Wireless Communications, Networking and Mobile Computing, 2008. (EI: 20090111834580)
[24]Study of construction bidding system based on combination of rough set theory and back-propagation network, 2007.(EI: 20081211155501)
[1] National March 8th Red-banner Pace-setter, 2012
[2] National A good advanced female individual, 2012
[3] Tianjin March 8th Red-banner Pace-setter, 2011
[4] Baogang excellent teachers award,2011
[5] Tianjin University Top 10 tutors, 2011
[6] Tianjin University Outstanding Communist party member to commemorate the 90th anniversary of the PCP, 2011
[7] Tianjin university teaching advanced pacesetter, 2010
[8] Tianjin May 1th Labor Medal, 2010
[9] The Research on long-effect governance mechanism of the default of project payment and Migrant wage in construction, second prize of the 11th Tianjin social science, 2010
[10]Tianjin Outstanding Teacher, 2009
[11]Tianjin municipal teaching team(PI), 2009
[12]National quality courses -The Project Cost Plan and Control(PI), 2008
[13]Excellent expert in the management of registered constructor, 2006
[14]The Research on the reform and development strategy of education in Chinese Management Science and Engineering Major, the first prize of the 11th Tianjin social science, second prize of Tianjin teaching achievement, 2005
[15]The second prize of excellent textbooks of regular ordinary college, 2002
[1] TianBao Group Project Management Implementation Program Optimization (PI). TianBao Group Construction Development Co., Ltd., 2009-2010
[2] Standards of Project Management and decoration of Government funded construction projects in TEDA (PI). Tianjin Technology and Economics
[3] The Research on long-effect governance mechanism of the arrears of project payment and Migrant wage in construction (PI). Hangzhou Municipal Construction Committee, 2007-2008
[4] Study on post-evaluation of Jixian-Tianjin highway. Tianjin Highway Administration, 2006.05-2007.12
[5] Study on post-evaluation of Tianjin-Shenyang highway. Tianjin Highway Administration, 2004.03-2006.02
[6] Study on professional liability and professional liability insurance for supervising engineer. Tianjin Municipal Construction Committee, 2003.04-2006.04.
[7] Research on the assistant decision-making system of bidding in engineering projects. China Geo-Engineering Corp, 2002.06-2004.12.
[8] International cooperation and financing in cross-border gas pipeline projects (PI). China National Petroleum Corporation, 1998-2000
[9] Contract and policy study in cross-border gas pipeline projects (PI). China National Petroleum Corporation ,1999-2001
[1] Research on credit behavior and governance model of practicing qualification personnel in construction market (PI). National Natural Science Foundation of China, 2012-2015
[2] Research on theory and method of risk identification, measurement and control in major construction project (Co-PI).National Natural Science Foundation of China, 2013-2016
[3] Research on credit evaluation system of certified constructor based on governance theory (PI). Ministry of Housing and Urban-Rural Development of China,2011-2012
[4] Construction Consulting Classification Criteria (PI). Ministry of Housing and Urban-Rural Development of China, 2010 – 2012
[5] Issues related to access to the construction industry in China (PI). Ministry of Housing and Urban-Rural Development of China, 2010 – 2011
[6] Research on theory and application of professional insurance in construction industry (PI).Ministry of Construction of China, 2004-2006
[7] Building management system for the 21st Century: Contracts and Risk Management (PI). Ministry of Construction, 1998-2000
[8] The Reform of Qualification Examination Reform (PI). Ministry of Construction of China (Co-PI), 2009
[9] Comparison between Chinese and Foreign Constructor Qualification System (Co-PI). Ministry of Construction, 2007-2008
[10]The reform and development of Management Science and Engineering Specialty (Co-PI). Ministry of Education, 2003-2004
[11]Construction quality management system (Co-PI). National Natural Science Foundation of China (79900026), 2000 -2002
[12]Risk and contract management for BOT projects (Co-PI). National Natural Science Foundation of China (79670066), 1997-1999
[13]International practice of project management (Co-PI). Ministry of Construction, 1997-1998
[1] Board Editor, Construction Management Journal
[2] Board Editor, Builders
[3] Board Director, China Construction Industry Association
[4] Board Director, China Engineering Consulting Association
[5] Board Director, China Construction Supervising Association
[6] Chartered Builder, The Chartered Institute of Building (CIOB), UK